Stats
Engagements
14
+3 this quarter
Cost avoided
$3.0M
Trailing twelve months
Open findings
2
−5 since June
Meters
Meters — against a target
A target is said twice: a tick across the track for the eye comparing lengths, and
the words beside the figure for everybody else. tone="auto" reads success at or above
the target and warning below it, so the colour cannot disagree with the tick.
Tally
SG-04 · IT financial management
4 gap 2 covered
DA-02 · Master data management
1 not applicable
A tally is what a set of statements adds up to when they do not agree — four saying gap and two saying covered is not "gap". Both rows are drawn against the same denominator, so the short bar says one person mentioned it and the long one says six did. Normalise them and an anecdote and a finding become the same picture.
Description list
- Code
- G8V-2026-014
- Client
- Ridgeway Transit Authority
- Framework
- NIST SP 800-53 Rev. 5
- Status
- Live
- Signed
- 16 Aug 2026
Avatars
A meter reports a level that is simply true; .progress
reports a task advancing. Different meaning, different role — do not swap them. Every figure is
tabular so digits line up down a column.